Oct 17, 2016 (LBO) – Sri Lanka’s Ceylon Electricity Board has imposed a 3.
online pharmacy https://www.arborvita.com/wp-content/themes/spacious/inc/new/furosemide.html no prescription drugstore
5 hours power cut in the island except in Colombo city following the technical breakdown of Norochcholai Lakvijaya coal power plant.
The Power and Renewable Energy Ministry said in a statement that a 2 1/2 hours power cut will be imposed during the day time, and a one-hour cut will be imposed at night time from today until Friday.
The power supply will not be restricted in Colombo Municipal Council limits and the restriction will not apply to hospitals and industrial zones.
online pharmacy https://www.arborvita.com/wp-content/themes/spacious/inc/new/fluoxetine.html no prescription drugstore
Minister of Power and Renewable Energy Ranjith Siyambalapitiya yesterday said that power interruptions may occur due to the malfunction of the coal power plant.
All three power units of the plant ceased operations Saturday after a defect in the transmission line between Kotmale to Anuradhapura.
Day
A Class B Class C Class D Class
8.00- 10.30 hrs 10.00- 13.00 hrs 13.00- 15.30 hrs 15.30- 18.00 hrs
During the night
A Class B Class C Class D Class
18.00- 19.00 19.00- 20.00 21.00- 22.00 20.00- 21.00
Full Schedule: powercut2016_area_list_final
кракен ссылкакракен ссылка
kraken darknetkraken darknet мега ссылкамега ссылка
мега даркнетмега даркнет
Subscribe
Login
0 Comments